|











| |
NY L&DC Branch of Local 300
Prior to 2001, the processing of Priority Mail was subcontracted. A national
level grievance was filed. The grievance was won, and the work was returned to
the Mail Handler craft. In December of 2001, the installation was designated the
"New York PMPC Branch" of Local 300.
On October 2, 2004 the installation became a
"mixed-use" facility and began to process other classes of mail, (1st Class
Parcels, Pre-sort, Standard Rate, etc.). The installation was changed to "New
York Logistical and Distribution Center." Now this
branch is referred to as the "New York L&DC Branch of Local 300".
There are many various operations &
processing equipment in this installation, such as; Platforms, Balldock,
Pre-sort Linear Sorter (LCTS), Universal Linear Sorter (LOCUS) -
for Outside
Parcels, 2 Parcel Sorters (Rapistans),
FSMs, & a APPS machine.
When this installation was a PMPC, there were no
PTFs & 25% casuals. In October 2, 2004 when the installation became a L&DC, PTFs
were hired and the casual percentage of 12.5% has been enforced.
The facility is relatively new, however the
building is old. The building (dating back to the 1930s/1940s) was originally
Plant 2 of Grumman Aerospace.
Current Local Agreement
NY LDC LMOU 2006-2011.pdf
Past Local Agreement
NY PMPC LMOU
10-30-02.pdf
|